Frame assembly fixture

Immediately consult:

Product Introduction Related Products

1. station and equipment overall planning:

I. Top cover welding is divided into three work stations:

1.1 Top skin tensioning and fixing station: CO2 welding and fixing one end of the skin; tensioning; CO2 welding and fixing the other end of the skin; the top edge skin and the frame edge longitudinal beam shall be welded by CO2.

Automatic spot welding station for 1.2 top skin: the process trolley lifts the top cover, automatically walks to the welding station, and places the top cover; Automatic spot welding of 2 welds, and the roof is covered.

The skin, top edge skin and top frame are welded together at the same time.

1.3 auxiliary position: repair welding of the top skin, open the air conditioner and roof window hole, and wear the air conditioner and cylinder bolt.

2. equipment characteristic requirements:

The 2.1 adopts double-station equipment: divided into skin tensioning, gluing and spot fixing stations; Large span and small span brake spot welding stations; The total length of the equipment is 33 meters.

After the 2.2 is tensioned and fixed, the top cover is sent to the automatic spot welding station by the process trolley, which is electrically controlled and automatically transported.

2.3 open programming, parameter preset storage fast, easy to call, with memory function.

The large-span (1000mm) spot welding and point-by-point (40-100mm) welding of the 2.4 top skin are automatically completed, and the welding distance can be set by person.

3. time beat:

The beat of the double-station equipment can reach 20 minutes/set, and each shift has 24 sets for 8 hours.