Wuling new energy G200P white body welding production line
Release time:
2023-10-08 16:52
Source:
This project is the Turnkey turnkey project of Liuzhou Wuling G200P project. Duoyuan is responsible for the design, manufacture, installation and acceptance of the main welding line, adjustment line, machine transportation line, upper body manual line, side wall manual line and corresponding steel structure of the whole project. The main equipment of the production line includes split fixture, main line total split fixture, total split opengate flexible switching system, lifting roller bed, AGV school bus, automatic gluing system, visual guidance system, etc. |
|
The main line assembly station mainly adopts opengate flexible switching system, equipped with 4 spot welders and 1 grabbing robot, which can realize flexible automatic switching of four models,The platform on the second floor is equipped with an empty skid return line, which can realize the skid ring-shaped Wang Fu transportation through the elevator, overflow roller bed and fixed roller bed. |
|
The whole project not only realizes the production of G200P single-row cab models, but also reserves a mixed-line production workshop for G200PS double-row cab models on the same platform, which can realize the sharing of multiple models. | |
project video |
|
|
Previous Page
Next Page
Contact Information
Mailbox:info@zzdy.cn
Tel:0371-62138138
Fax:0371-62138138
Address:Automobile Industrial Park, South Section of West Ring Road, Zhongmou County, Zhengzhou, China